Feature release sprint
Ship it, then say you shipped it. Build, changelog, and announcement in one batch. 3 of them move together — schedule one and the rest follow.
This template: 4 tasks · 6h 15m
Website
- Build the feature — 4h · linked
- Write the changelog entry — 30m · linked
- Record a 30-second demo — 45m · linked
YouTube
- Post the walkthrough — 1h
Start from this
It fills a new project with these tasks across these channels, with the linked ones already batched. Nothing is locked afterwards — the names, the durations and the channels are all yours to change.